Case study

How Freight Tiger improved visibility and control across the network of an integrated steel giant

A leading integrated steel manufacturer was managing a highly distributed, multi-modal logistics network spanning 13 plants, 45 stockyards, rail sidings, 100+ active lanes and 200+ logistics partners. Fragmented GPS/SIM tracking, manual follow-ups and the absence of a single network view meant delays, stoppages and diversions were often identified only after they had already affected operations.

Download the PDF
98%
Real-time visibility across dispatches
~5%
Delays, down from ~30%
~95%
Fewer manual follow-ups
Industry
Steel
Products used
Visibility

A leading integrated steel manufacturer was managing a highly distributed, multi-modal logistics network spanning 13 plants, 45 stockyards, rail sidings, 100+ active lanes and 200+ logistics partners. Fragmented GPS/SIM tracking, manual coordination and the absence of a single network view meant delays, stoppages and diversions were often detected only after they had disrupted operations. Freight Tiger unified tracking and exception monitoring across the network, enabling real-time visibility and faster intervention.
The result: The manufacturer achieved 98% real-time visibility across dispatches, reduced delays from ~30% to ~5%, and cut manual follow-ups by ~95%.